Sustain/Repair Control Tower Roof

  • Contract Number: FA4460-16-P-0018
  • Contract Value: $134,725.00
  • Contract Location: Little Rock AFB, AR
  • Completion Date: November 2016

About this Project

This was a design/build project which required CNC to replace the existing membrane roof on the Control Tower with a polyvinyl-Chloride roof. CNC removed the existing roofing materials, prepped the roof, and replaced the roof based on Government requirements. CNC also installed a complete lightning system which included air terminal devices, interconnecting conductors, down conductors, ground rods, and buried ground grid. Incidental work included cleaning and repainting mechanical fan coil units.